Canyon Creek Logo  Canyon Creek Homeowners Association
Skip Navigation Links.  
            
Skip Navigation Links > Documents > Architectural Approval > Windows  

Application for New Windows
(and Sliders/French Doors installed along with windows)

Use this form to request Architectural Review Committee approval of new or replacement windows (and any sliding glass doors (sliders)/French doors installed at the same time).

NOTE: Please refer to Chapters 6, 7 and 8 of the Resident Handbook for complete information about architectural approval requirements, architectural and landscaping guidelines and standards, and the approval process.

Forms may be filled in online, but must be printed, mailed and logged by Total Property Management before they can be reviewed by the Architectural Review Committee. Please include a manufacturer's brochure indicating window/slider/French door style and color. If a leaded/stained glass window, include a drawing showing the design and colors to be used. You must also include a diagram showing the locations of the windows/sliders/French doors being replaced. Click here to view and print a floor plan for your home then indicate which windows are being replaced by which windows styles listed below. When this form is completed, mail it and the required attachments to:

Total Property Management
Canyon Creek Community Manager
2 Corporate Park, Suite 200
Irvine, CA 92606
 
NOTE: Architectural guidelines may require that frames of windows not being replaced be painted to match the new windows depending on window location. Consult the "Windows and Screens" section of the "Architectural and Landscaping Guidelines and Standards" chapter in the Canyon Creek Resident Handbook.

Please advise your neighbors before construction begins.

Date:    Phone:
Name:    Address:
Installation Date:    Manufacturer:
Product Name:
   Color:

Number of windows being replaced on the
    Front           Left Side (when viewed from the front)          
    Rear     Right Side (when viewed from the front)

Material: Vinyl   Wood   Aluminum   Other:

Window and Glass Type (indicate the number of each style and select glass type for each):

Qty Double Hung Windows (top and bottom slide up and down)
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Qty   Single Hung Windows (top fixed and bottom slides up and down)
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Qty   Casement Windows (cranks out and opens to the left or right)  
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Qty   Awning Windows (cranks out and opens from the bottom)  
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Qty   Horizontal Sliding Windows (left and/or right slides side to side)
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Qty   Fixed Picture Windows (do not open)
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Qty   Sliding Glass Doors
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Qty   French Doors  
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Qty   Other  Window/Door Type    Please describe:
      Clear multi-pane with solid dividers  
      Clear multi-pane with simulated dividers (dividers between double-pane glass)  
      Clear single pane (no dividers)  
      Other:     
      Mixture of glass types (explain in Comments below)

Does your home have a garden window? Yes    No

If "Yes," what are you going to do with the garden window? Replace it     Paint frame to match new windows

Are you replacing all exterior facing windows? Yes   No

If "No," which windows are NOT being replaced?

NOTE: If the windows not being replaced can be seen from the Common Area, the frames must be painted to match the frames of any replacement windows that are also visible from the Common Area. In other words, the frames of all windows visible from the Common Area must all be the same color. Consult the "Windows and Screens" section of the "Architectural and Landscaping Guidelines and Standards" chapter in the Canyon Creek Resident Handbook for more information.

Will you require a dumpster? Yes   No

Additional Comments: 

Notice of Completion

Homeowners must complete and submit to the Community Manager a Notice of Completion (which is included at the bottom of this form or can be found in the Documents section of www.CanyonCreekHOA.com) within thirty (30) days of completing the Improvement.

Neighbor Advisement (Adjacent Neighbors)

You must obtain the signatures of adjacent neighbors (owners, not tenants) showing that they have been made aware of the intended improvement. Neighbor comments and signatures indicate that they have been notified and do not imply approval, which can only be granted by the  Architectural Review Committee (ARC). However, ARC may contact neighbors to evaluate their comments.

1st Neighbor Name:      Address:

Comments:

Signature: _______________________________________  Date: _________________


2nd Neighbor Name:      Address:

Comments:

Signature: _______________________________________  Date: _________________


3rd Neighbor Name:      Address:

Comments:

Signature: _______________________________________  Date: _________________


At the current time, this form cannot be submitted electronically. Fill out the form online then use your browser's Print button to print this form. Complete and return this form along with any necessary plans to the Community Manager (do not submit it to an Architectural Committee member). Your submission will be logged and filed then distributed to the Architectural Review Committee for approval. When a decision has been rendered, the Community Manager will send you a letter with the final decision within 30 days of original receipt of your application.

To be completed by Architectural Review Committee:

Authorized to Proceed     Conditional Approval (see below)     Disapproved (see below) by the required majority of the Canyon Creek Architectural Review Committee.

Conditions of approval or reason for disapproval:

Architectural Review Committee Member Approval

Authorized to Proceed     Conditional Approval     Disapproved

Signature: _________________________________      Date: ______________
                  Architectural Committee


Authorized to Proceed     Conditional Approval     Disapproved

Signature: _________________________________      Date: ______________
                  Architectural Committee


Authorized to Proceed     Conditional Approval     Disapproved

Signature: _________________________________      Date: ______________
                  Architectural Committee


Notice of Completion Form - COMPETE AND RETURN THIS PORTION WHEN THE PROJECT IS COMPLETED!

  1. Homeowners must complete and submit to the Community Manager a Notice of Completion within thirty (30) days of completing the Improvement.
  2. The Community Manager will log receipt of the Notice of Completion send a copy of it to the Architectural Review Committee (ARC) chairperson.
  3. The ARC chairperson will assign an ARC member who will inspect the Improvements within thirty (30) days after notification.
  4. The ARC member performing the inspection will indicate on the Notice of Completion whether or not the Improvement was completed in substantial accordance with the submitted application and plans.
  5. The ARC will deliver the signed Notice of Completion to the Community Manager for filing and a copy will be mailed to the Homeowner.
  6. If the inspection shows substantial deviations from the approved Improvements, the ARC shall notify the Community Manager who will notify the Homeowner of the non-compliance and the steps needed to resolve the non-compliance within sixty (60) days of completing the inspection. Continued non-compliance may result in fines and/or legal action by the Association.

Forms may be filled in online, but must be printed, mailed and logged by Total Property Management before they can be reviewed by the Architectural Review Committee. Do not send directly to the Architectural Review Committee.

Total Property Management
Canyon Creek Community Manager
2 Corporate Park, Suite 200
Irvine, CA 92606
 


Name:   Phone:
Address:
Description of Improvement:

On , I completed the improvements as outlined in my approved Home Improvement Application. It is understood that additional work may not commence without prior application to and approval by the ARC.

Homeowner signature: _______________________________________  Date: _________________


ARC Inspection

The improvement has been inspected and found to be:

In substantial compliance with the approved application.
Not in substantial compliance with the approved application for the following reasons:

ARC member signature: _______________________________________ 

Date: _________________